Keyboard shortcuts

Navigating in a register

Press

To

Arrow keys

Move one cell up, down, left, or right

Tab

Move to the next cell in the same row

SHIFT+Tab

Move to the previous cell in the same row

Home

Move to the beginning of the cell

End Move to the end of the cell
Page Down Move to the last row in the register
ALT+Down Arrow Shows the contents of drop-down list choices for applicable fields
Numpad * Expands the subordinate leaves of a tree structure for the currently highlighted branch
Numpad + key Expands the currently highlighted section to display subordinate sections
Numpad - key Collapses the currently highlighted section to remove the display of subordinate sections
CTRL+Spacebar Selects and Deselects a row
CTRL+Tab Toggles the display of open windows
ALT Activates form menus
ALT+F4 Closes active form
CTRL+G Opens the Go To Column navigator

Navigating in a record

Press

To

Left and right arrow keys Move one character left or right in an editable field
TAB Move to the next editable field in the record
SHIFT+TAB Move to the previous editable field in the record
Home Move to the beginning of the field
End Move to the end of the field
ALT+Down Arrow Shows the contents of drop-down list choices for applicable fields
F4 Shows the contents of drop-down list choices for applicable fields
CTRL+Spacebar Selects and deselects a row
CTRL+TAB Toggles the display of open windows
ALT Activates form menus
ALT+F4 Closes active form
CTRL+G Opens the Go To Column navigator

Menu and keystroke commands

All forms have their own set of commands specific to the form. Commands for a form show in the ribbon on contextual tabs (Actions and More Actions) when it is open and the form is active. Click a command on the tab to order it. Some routine commands can be ordered using the standard Windows keystroke combinations (e.g., Ctrl+C, Ctrl+V) or right-click with the mouse when the field is selected.

Function keys in Estimate

Key Function
F1 Open to the Help
F2 (grid) Edit cell value: Enter edit mode for cells that are editable on the grid
F2 (tree list) Edit cell value: Enter edit mode for cells that are editable on the tree list
F3 Find next: Finds the next value based on the search criteria
F4 (grid) Show selection register or options in the drop down
F5 Refresh, wherever available
F5 Collapse subordinate Items
F6 Expand subordinate Items

In the Account Code Utilization Register, F5 can either refresh or collapse subordinates based on whether an account code is selected.